Jerusalem

Supreme Supervision & Design Review of Steel Lining Installation for Water Supply System 5th Line

Water supply system 5th line to Jerusalem – Eastern Segment. Supervision, monitoring and inspection of steel lining installation.

Services carried out
  • Monitoring and inspection of steel lining installation
  • Supervision and monitoring
Dates
2020 - 2022